COREWIND A4 Leaflet

April 2020

The Corewind leaflet provides a snapshot of the Corewind project, its objectives and partners involved

Download

Review of the state of the art of mooring and anchoring designs, technical challenges and identification of relevant DLCs

February 2020

This publication defines current mooring and anchoring state of the art for floating wind projects currently installed or in construction phase. The aim is to ensure specifications and requirements to be developed within mooring account for current industry status.

Download

Review of the state of the art of dynamic cable system design

February 2020

This document defines the current dynamic cable state of the art for floating wind projects currently installed or being engineered which will ensure specifications and requirements to be developed account for current industry status.

Download

Design Basis

December 2019

The purpose of this document is to define the basis for the analysis and design of the FOWT configurations to be developed during this project. The basis defines the framework for covering the design of both floater types (spar and semi-submersible) and all their subsystems.

Download

Definition of the 15MW reference wind turbine

October 2019

This publication defines a 15 MW reference wind turbine, implemented in the aeroelastic HAWC2 model. The turbine feeds into the further activities in WP1 and the rest of COREWIND, and will form the basis for the floater designs of COBRA and UPC.

Download

Report of initial Kick-off meeting (KoM)

September 2019

The Kick-off Meeting (KoM) is the first General Meeting with the main objective of launching a Project, coordinating how the work starts and defining the framework and steps for achieving the defined objectives.

Download